Step 1 of the new construction is to remove the siding from the east side of the house – revealing very ugly yellow clapboard riddled with holes from the blown in insulation.
Step 2 begins tomorrow as the east side of the foundation is excavated. New drainage goes in along the wall, the concrete blocks will be parged and a basement will be dug for the mud/laundry/bathroom.