Nearly finished the new back deck bridges the gap between the ipe decking tiles on the south side of the house and the garage/mud room.
It provides a very sheltered area from the wind and we moved the table and chairs to this area.
Inside work continues on the attachment. The knotty pine is being modified to 1/2 height with a chair rail. A frosted glass pocket door is being installed in place of the curtain. Hopefully, the frosted glass will provide light, but some privacy from viewing all the way down the hall. Linoleum is being installed within the attachment. The bathroom is on the immediate left with the laundry next on the left across from the large closet.