We returned from our weekend camping trips to find the concrete block walls in place and the back filling of dirt around the walls.
Next the floor for the garage was poured, the walls framed for the garage and attachment and wrapped with Tyvek.
The laundry room and bathroom will be located on the right and a closet located on the left side.
A double door will lead to a small deck and the rest of the decking.
Footings were poured for the porch and steps leading to the front door.
Vinyl siding was installed on the west side of the house. The color is a greenish grey called Sage Brook. You can see in the brighter light (top right) it looks grayer and in the shade (left side) it looks greener.